Quote:
|
When you drive past it doesn't look far off finishing. the big fly in the ointment is that it doesnt link up with the existing system and there probably won't be a KL type traveller friendly fast link
|
The 'bridge' is there in many places, in many places it's not. Still got to lay track, test commission etc. The extension at Saphan Taksin has had the infrastructure completed for months and is still not close to opening. I would think maybe even 2 years for the rail link. It will link into the existing system at Phayathai.
There is a mani terminal building where City check In will take place at Makkasan. That is a long time from completion. You can see it from the highway into Sukhumvit, White Steel arches for the roof.