|
Apparently the story with Airbus is that the electrical engineering department where using an old version of the engineering software package and the other departments where using a newer version of the same engineering software package, but unfortunately the 2 versions are not compatible, so the electrical systems could not be intregrated into the final designs easily, resulting in the delays. Abit of an oversight.
__________________
Look you tools, no mod cap!!!!
|